Project of Water Pollution Preventing and Control Permission Replacement Examination (South Area) (3-rd years)

Absrtact
The goal in this project was 4,200 licenses should be examined and replaced, which included 3,300 paper examinations and 400 site examinations. But the examination requirements of each county application were difference from the original prediction in this project. Therefore the Environmental Protection Administration(EPA) regulated the examination amount of each county by actual situation monthly. This project was examined and replaced application for 10 southern counties from 1 May 2007, and added the applications of Taoyuan County to southern area from March 2009. Results of the implementation were described as below: In 2007, 653 permission applications were examined in this project, which included 24 engineering improvement examinations, 619 permission replacement examinations (471 site examinations and 148 paper examinations), and 10 were not issued permission applications (6 site examinations and 4 paper examinations). In 2008, 1,399 permission applications were examined, which included 1,289 approved cases (174 site examinations and 1,115 paper examinations) and 50 unissued cases (10 site examinations and 40 paper examinations). Besides, there were 162 new added permission applications ( 36 engineering improvement paper examinations, 29 site examinations and 97 paper examinations) in this year. In 2009, 1,089 permission applications were examined, which included 348 approved permission replacement for animal husbandry (163 site examinations and 185 paper examinations), 67 unissued cases (only paper examinations), 610 approved permission replacement for non-animal husbandry (245 site examinations and 365 paper examinations), and 64 unissued cases (20 site examinations and 44 paper examinations). Besides, there were 33 new added businesses submitted the permission applications (18 site examinations and 15 paper examinations) and 401 factory site survey. As described permission replacement examination, new added businesses permission examination, and factory site survey, furthermore 3 appointed phone calls for business consultants and service regularly in this project.
Keyword
Permission,Replacement,Examination
Open
top